Your documentation in. Tested units out.

Series production of control panels, cable harnesses and electromechanical assemblies — built to your drawings, batch after batch.

The division at a glance

We are a series-production company that builds other people’s products.

GANI Manufacturing is the production heart of the group — a team built around one discipline: taking a machine builder’s documentation and turning it into identical, tested units, delivery after delivery. Control cabinets, operator consoles, remote I/O, pre-wired modules, complete box-build devices with pneumatics, firmware and parameterization. For machine builders, the scope extends into PLC and HMI software work and process development. The product stays yours; the repetition becomes ours.

Discuss your scope
Series assembly on the shop floor — the same unit, the same way, every batch.

Series assembly on the shop floor — the same unit, the same way, every batch.

WHICH DOOR IS YOURS?

Manufacturing or Contract Manufacturing?

Both build from your documentation. The difference is what leaves our floor.

GANI Manufacturing

Assemblies that go inside your machine.

  • Series control panels, operator panels, remote I/O
  • Cable harnesses and pre-wired electrical modules
  • Electromechanical subassemblies, build-to-print
  • You keep the product; we take the repetition
GANI Contract Manufacturing

Your complete, sellable product — boxed.

  • Complete device build: mechanics, electronics, firmware, test
  • Plastics and PCBA coordinated through qualified partners
  • Labelled, serialized and packed under your brand
  • Product transfer and capacity extension for a running product
Explore Contract Manufacturing

Still unsure? Send the drawing set — we will tell you which door fits, in one reply.

THE LINE

From your documentation to the truck.

01Documentation transferEPLAN, drawings, BOM andstandards land with ourengineering team.02NPI & DFMManufacturability review,alternative components, workinstructions, golden sample.03Sourcing & kittingPurchasing, inventory and kitsprepared per releasedrevision.04Assembly & wiringMechanical and electricalbuild — panels, harnesses,complete devices.05Firmware & parametersPLC / HMI / firmware loadingand parameterization per unit.06100% functional testAutomated where volumejustifies; serial-number-basedtest record.07Pack & dispatchLabeled, documented, packed —daily truck departures towardthe EU.08LifecycleSpares, repair, retrofit andend-of-life via GANILifecycle.
  1. 01Documentation transfer

    EPLAN, drawings, BOM and standards land with our engineering team.

  2. 02NPI & DFM

    Manufacturability review, alternative components, work instructions, golden sample.

  3. 03Sourcing & kitting

    Purchasing, inventory and kits prepared per released revision.

  4. 04Assembly & wiring

    Mechanical and electrical build — panels, harnesses, complete devices.

  5. 05Firmware & parameters

    PLC / HMI / firmware loading and parameterization per unit.

  6. 06100% functional test

    Automated where volume justifies; serial-number-based test record.

  7. 07Pack & dispatch

    Labeled, documented, packed — daily truck departures toward the EU.

  8. 08Lifecycle

    Spares, repair, retrofit and end-of-life via GANI Lifecycle.

PROCESS CONTROL

The answers your supplier questionnaire asks for.

Series manufacturing is a discipline problem before it is a capacity problem. These are the controls that keep a repeat build repeatable — and the reason a deviation never reaches your line quietly.

Incoming inspection

Goods are checked against the drawing and the approved supplier list before booking. Suspect material is quarantined, not consumed.

Revision & ECN control

Every build runs against one released revision. Engineering changes are quoted, released and effective from an agreed serial or date.

Deviation approval

Any departure from the documentation is proposed in writing and built only after your approval. Nothing is absorbed silently.

Alternative components

Alternates are proposed against the datasheet with a comparison, and enter the BOM only once you approve them.

First article & golden sample

The first unit of a new build is inspected and approved as the reference against which the series is judged.

Release gates

Kit complete, build complete, test passed, inspection signed — a unit cannot skip a gate to make a shipment.

Nonconformity handling

Escapes and internal findings are recorded with a containment action, a root cause and a verified correction.

Traceability

Serial number to component lot, work order, operator and test record — retrievable years later.

FIT & SOURCING

How the work is usually shaped.

Typical batch fit

High-mix work in batches of tens to a few hundred units, repeating through the year under a frame agreement.

Annual volume fit

Programs from a few hundred to several thousand units a year — where engineering support matters more than the lowest piece price.

GANI-sourced material

We buy the full BOM against your approved list and carry the supply-chain work.

Customer-supplied material

You supply critical or directed-buy parts; we receive, inspect, store and account for them per work order.

Hybrid sourcing

The common case: you direct the critical components, we source the rest and manage the lead times.

Consignment & call-off

Rolling forecasts with agreed call-off windows, plus finished-goods staging where the route requires it.

CAPABILITY MATRIX

What OEMs transfer to GANI.

OEM series panel production

  • Control cabinets
  • PLC / HMI panels
  • Servo / VFD panels
  • Safety panels
  • Operator panels & consoles
  • Remote I/O boxes
  • Power distribution / MCC panels
  • Pre-wired electrical modules

Electromechanical contract assembly

  • Complete assembly of your industrial device
  • Mechanical assembly
  • Electrical assembly & wiring
  • Pneumatic assembly
  • Sensor / actuator integration
  • PLC / HMI / firmware loading & parameterization
  • Functional testing
  • Labeling, packaging & dispatch

Box-build / complete equipment

  • Beyond the panel: complete, tested devices and machine modules delivered ready for integration

Cable & harness / subassemblies

  • Cable sets
  • Sensor cable groups
  • Pre-wired modules
  • Electrical and electromechanical subassemblies

NPI / industrialization

  • BOM analysis
  • EPLAN / technical documentation review
  • Design for manufacturing (DFM)
  • Alternative component qualification
  • Assembly-time optimization
  • Work instructions
  • Golden samples
  • Test procedures & test fixtures

Software & process engineering

  • PLC / HMI software alongside series panels
  • Process development & improvement for machine builders

Functional testing / FAT

  • 100% functional testing
  • Automated test systems
  • Serial-number-based test records
  • Traceability
  • Test reports & quality documentation

Supply-chain responsibility

  • Component purchasing
  • Inventory management & kitting
  • Supplier management
  • Alternative component management
  • Running the production chain on your behalf
Capacity extension

Keep your line. Add ours.

You keep your own production; we build approved parallel capacity beside it. That can start as small as a 20-per-day variant running next to your 1000-per-day line — and grow, if you choose, to the entire outsourced volume. Same documentation, same test regime, same unit at the end.

Discuss your scope
LANDMARK INFRASTRUCTURE

Buildings you can name.

Station, museum, tower — automation infrastructure engineered by GANI Engineering and built by GANI Manufacturing, delivered into construction programmes that do not wait.

GOOD TO KNOW

Questions we hear first.

What do you need from us for a quotation?

Your documentation as it exists today: schematics (EPLAN, PDF or DWG), a BOM, mechanical data if relevant, applicable standards and target quantities. An NDA is available on request.

What is a golden sample?

The first unit built and approved during industrialization. It freezes the reference standard — every later unit in series is built and tested against it.

Do you build to our standards or yours?

Yours. Your drawing standards, labeling rules and applicable norms govern the build; our quality system governs how we prove conformity — routine tests, serialization and unit test records.

What does 100% testing mean in practice?

Every unit — not a sample — passes a functional test before dispatch. Results are recorded against the serial number, so any unit can be traced from component lot to test record.