Request for Quotation
Station automation infrastructure, Gare de Mons
GANI ENGINEERING + MANUFACTURING — WORK PACKAGEMons, Belgium

Station automation infrastructure, Gare de Mons

Control and distribution infrastructure for the new Mons station: engineered by GANI Engineering, built as documented panel series by GANI Manufacturing, and handed over technical room by technical room while the station stayed open.

PROGRAM PROFILE
Delivery geography
Belgium
Variants in scope
9 technical rooms, 24 panel types
Program duration
14 months, staged handover
Responsibility level
Work package
Standards applied
IEC 61439-1/-2 · IEC 60364 installation practice · Client technical specification
THE BUILDING0102030405CONCOURSEPLATFORM LEVELGARE DE MONS · STATION AUTOMATION · BE

Schematic elevation drawn by GANI to locate the scope — not an architectural document.

WHAT IT DOES

What the delivered system actually does.

What was delivered is the layer between a station building and the people running it. Every technical room in the station holds control and distribution panels; those panels feed and switch the lighting, drive the ventilation and smoke-extraction interfaces, and report the state of each zone back to one supervision screen in the operations room.

In daily use it means an operator sets a lighting profile for the concourse by time of day rather than by walking to a switch room, sees a ventilation fault as a named zone rather than as an alarm code, and can hand a contractor a documented isolation for one area without darkening the rest of the station.

What it is for, in one sentence: a station that stays open, stays lit, stays ventilated, and can prove — room by room, with a test record per panel — that each zone was accepted before it was used.

THE CHALLENGE

A station is not a factory: it never really stops, the public is inside it, and the architecture leaves technical rooms scattered wherever the structure allows. The automation infrastructure had to reach a soaring concourse, the platform level below it and a set of remote technical rooms — with cable routes fixed by the building, an electrical contractor working to a construction programme, and an operator who needed every zone documented before accepting it.

STARTING CONDITION

A specification, a room schedule and a single-line concept existed. The detailed panel design, the field distribution and the integration to the operator systems did not.

CUSTOMER PROVIDED
  • Client technical specification and room schedule
  • Single-line concept and load lists per technical room
  • Architectural and MEP coordination drawings
  • Operator interface and naming conventions for the supervision system
  • Construction programme with staged handover dates
GANI OWNED
  • Detailed electrical design in EPLAN, panel by panel, against the room schedule
  • Series build of the control and distribution panels to IEC 61439 in Bursa
  • Factory acceptance test per panel, with the client joining the critical ones
  • Field distribution boxes, labelling and cable schedules prepared per zone
  • Controls programming and integration to the operator supervision system
  • Staged delivery and on-site support through commissioning and handover
OUTCOME

What the program delivers.

  • Every technical room handed over with its own documentation set and test record
  • Concourse, platform and technical zones supervised from one operator interface
  • Panels arrived pre-tested, so site time went into commissioning rather than rework
  • Naming and labelling consistent from the drawing to the supervision screen
SYSTEMS IN SCOPE

What the infrastructure actually controls.

  • 01Concourse and platform lighting control by zone and time profile
  • 02HVAC control interfaces and smoke-extraction signalling
  • 03Escalator, lift and gate status collected for supervision
  • 04Access control and technical-room monitoring
  • 05Gateway to the operator supervision system
  • 06Energy metering per zone and per feeder