Request for Quotation
Transportation & rail

Transportation & rail

Rail and transportation equipment stays in service for decades, and its electrical systems have to keep up. GANI has delivered into this sector and engineers for the long lifecycle from day one — traceable builds, managed obsolescence, dependable spares.

  • Electrical assemblies
  • Control systems
  • Obsolescence management
WHAT THIS SECTOR DEMANDS

The bar, as your buyers set it.

01

Multi-decade lifecycle support and obsolescence management

02

Serial-number traceability across long production runs

03

Consistent quality over years of repeat delivery

PROJECT ARCHIVE

Delivered in transportation & rail.

A selection from the program archive. Customer names are shared under NDA.

  1. 01
    Door-control retrofit for metro fleet

    Fleet-wide door-control retrofit for a rail-systems integrator, exchanging obsolete controllers car by car within scheduled maintenance windows.

    LIFECYCLELIFECYCLE
  2. 02
    Underframe harness families for LRV program

    Underframe and roof harness families for a light-rail vehicle program, 100% tested and delivered as car-set kits with serial traceability.

    MANUFACTURINGSERIES
  3. 03
    Depot workshop MCC and distribution boards

    IEC 61439 motor control and distribution boards for a rail depot workshop, engineered in EPLAN and installed against a phased shutdown plan.

    MANUFACTURINGWORK PACKAGE
  4. 04
    Platform-screen-door control subsystem

    Station-level control subsystem for platform screen doors, with redundant PLCs, HMI diagnostics and interface testing to the signalling boundary.

    ENGINEERINGSUBSYSTEM
  5. 05
    Bogie test-bench automation

    Turnkey automation of a bogie load test bench, covering hydraulics control, safety interlocks and report generation, accepted via FAT/SAT.

    ENGINEERINGTURNKEY
  6. 06
    Coupler electronics box-build

    Box-build of coupler electronic modules for a rail-systems integrator, assembled to golden samples with per-unit test records retained.

    MANUFACTURINGSERIES
  7. 07
    Cab console family for regional trains

    Driver-cab console family produced in left- and right-hand variants, pre-wired, 100% tested and delivered ready for carbody installation.

    CONTRACT MANUFACTURINGPRODUCT
  8. 08
    Tunnel ventilation control panels

    Control panels and PLC software for tunnel ventilation groups, built to IEC 61439 and commissioned zone by zone during night possessions.

    ENGINEERINGWORK PACKAGE
  9. 09
    Airport baggage-line control retrofit

    Controls retrofit of a baggage-handling merge section, migrating the PLC program and drives while keeping daytime operations untouched.

    LIFECYCLEEXPERT TASK
  10. 10
    Spares program for tram traction cabinets

    Structured spares program for tram traction cabinets, holding tested exchange units and tracking obsolescence across the installed fleet.

    LIFECYCLELIFECYCLE
  11. 11
    Signalling-room rack pre-wiring

    Pre-wired equipment racks for signalling rooms, built off-site to EPLAN documentation and tested before delivery, 12 racks per station-set.

    MANUFACTURINGSERIES
  12. 12
    Second line-set for bus-charger cabinets

    Additional build line for e-bus charger cabinets, mirroring existing jigs and test stations to double the achievable cabinet throughput.

    MANUFACTURINGCAPACITY EXTENSION
  13. 13
    NPI for onboard passenger-counting nodes

    NPI run for onboard passenger-counting nodes, qualifying golden samples, cable variants and packaging before fleet-wide series release.

    CONTRACT MANUFACTURINGEXPERT TASK