
Transportation & rail
Rail and transportation equipment stays in service for decades, and its electrical systems have to keep up. GANI has delivered into this sector and engineers for the long lifecycle from day one — traceable builds, managed obsolescence, dependable spares.
- Electrical assemblies
- Control systems
- Obsolescence management
The bar, as your buyers set it.
Multi-decade lifecycle support and obsolescence management
Serial-number traceability across long production runs
Consistent quality over years of repeat delivery
Our work in transportation & rail.
Delivered in transportation & rail.
A selection from the program archive. Customer names are shared under NDA.
- 01Door-control retrofit for metro fleetLIFECYCLE
Fleet-wide door-control retrofit for a rail-systems integrator, exchanging obsolete controllers car by car within scheduled maintenance windows.
- 02Underframe harness families for LRV programMANUFACTURING
Underframe and roof harness families for a light-rail vehicle program, 100% tested and delivered as car-set kits with serial traceability.
- 03Depot workshop MCC and distribution boardsMANUFACTURING
IEC 61439 motor control and distribution boards for a rail depot workshop, engineered in EPLAN and installed against a phased shutdown plan.
- 04Platform-screen-door control subsystemENGINEERING
Station-level control subsystem for platform screen doors, with redundant PLCs, HMI diagnostics and interface testing to the signalling boundary.
- 05Bogie test-bench automationENGINEERING
Turnkey automation of a bogie load test bench, covering hydraulics control, safety interlocks and report generation, accepted via FAT/SAT.
- 06Coupler electronics box-buildMANUFACTURING
Box-build of coupler electronic modules for a rail-systems integrator, assembled to golden samples with per-unit test records retained.
- 07Cab console family for regional trainsCONTRACT MANUFACTURING
Driver-cab console family produced in left- and right-hand variants, pre-wired, 100% tested and delivered ready for carbody installation.
- 08Tunnel ventilation control panelsENGINEERING
Control panels and PLC software for tunnel ventilation groups, built to IEC 61439 and commissioned zone by zone during night possessions.
- 09Airport baggage-line control retrofitLIFECYCLE
Controls retrofit of a baggage-handling merge section, migrating the PLC program and drives while keeping daytime operations untouched.
- 10Spares program for tram traction cabinetsLIFECYCLE
Structured spares program for tram traction cabinets, holding tested exchange units and tracking obsolescence across the installed fleet.
- 11Signalling-room rack pre-wiringMANUFACTURING
Pre-wired equipment racks for signalling rooms, built off-site to EPLAN documentation and tested before delivery, 12 racks per station-set.
- 12Second line-set for bus-charger cabinetsMANUFACTURING
Additional build line for e-bus charger cabinets, mirroring existing jigs and test stations to double the achievable cabinet throughput.
- 13NPI for onboard passenger-counting nodesCONTRACT MANUFACTURING
NPI run for onboard passenger-counting nodes, qualifying golden samples, cable variants and packaging before fleet-wide series release.
The three routes most programs in this sector take — each with its scope, its standards and a delivered case.