
Industrialization and test.
MANUFACTURING
NPI is a quoted phase with a defined output — not a favor buried in the first invoice. Your product is made series-ready, and every later unit is proven against the golden sample.
NPI / industrialization
- BOM analysis
- EPLAN / technical documentation review
- Design for manufacturing (DFM)
- Alternative component qualification
- Assembly-time optimization
- Work instructions
- Golden samples
- Test procedures & test fixtures
Functional testing / FAT
- 100% functional testing
- Automated test systems
- Serial-number-based test records
- Traceability from component lot to test record
- Test reports & quality documentation
THE LINE
Part of one accountable flow.
- 01Documentation transfer
EPLAN, drawings, BOM and standards land with our engineering team.
- 02NPI & DFM
Manufacturability review, alternative components, work instructions, golden sample.
- 03Sourcing & kitting
Purchasing, inventory and kits prepared per released revision.
- 04Assembly & wiring
Mechanical and electrical build — panels, harnesses, complete devices.
- 05Firmware & parameters
PLC / HMI / firmware loading and parameterization per unit.
- 06100% functional test
Automated where volume justifies; serial-number-based test record.
- 07Pack & dispatch
Labeled, documented, packed — daily truck departures toward the EU.
- 08Lifecycle
Spares, repair, retrofit and end-of-life via GANI Lifecycle.
GANI MANUFACTURING


