Request for Quotation
Stock bridge inventory held during a production transfer

Move a running product without missing a delivery.

Transferring production is a risk decision, not a price decision. The question is never only what a unit costs at the new supplier — it is whether your customers notice the change. They should not.

WHY OEMS TRANSFER

The trigger is usually one of these.

  • Your current supplier cannot follow your volume — up or down
  • Engineering support disappeared after the first order
  • Quality escapes are handled with an apology instead of a root cause
  • A product is too small for your own line but too important to drop
  • Second-source pressure from your own customers
  • The supplier is exiting the product, the market or the business
THE TRANSFER PLAN

Nine steps, none of them optional.

01Fit checkVolumes, complexity andstandards reviewed beforeanyone signs anything.02NDA & intakeDrawings, BOM, revisionstatus, test specs andpackaging rules land with03Gap analysisWhat is documented, what livesonly in the old supplierheads, what must be recreated.04Supplier mappingDirected-buy parts, alternatesto qualify, long-lead itemsflagged early.05IndustrializationWork instructions, fixturesand test procedures — thegolden sample defined.06Pilot batchBuilt on the real process,functionally tested, reviewedwith you before ramp.07ValidationFirst article and your writtenapproval, against yourstandards.08Ramp & stock bridgeOld and new supply overlap onpurpose, so the shelf neverruns dry.09Steady stateFrame agreement, rollingforecast, lifecycle andobsolescence watch.
  1. 01Fit check

    Volumes, complexity and standards reviewed before anyone signs anything.

  2. 02NDA & intake

    Drawings, BOM, revision status, test specs and packaging rules land with engineering.

  3. 03Gap analysis

    What is documented, what lives only in the old supplier heads, what must be recreated.

  4. 04Supplier mapping

    Directed-buy parts, alternates to qualify, long-lead items flagged early.

  5. 05Industrialization

    Work instructions, fixtures and test procedures — the golden sample defined.

  6. 06Pilot batch

    Built on the real process, functionally tested, reviewed with you before ramp.

  7. 07Validation

    First article and your written approval, against your standards.

  8. 08Ramp & stock bridge

    Old and new supply overlap on purpose, so the shelf never runs dry.

  9. 09Steady state

    Frame agreement, rolling forecast, lifecycle and obsolescence watch.

WHAT YOU GET, WHAT YOU APPROVE
  1. 01

    Fit check

    Volumes, complexity and standards reviewed before anyone signs anything.

    Deliverable

    Written feasibility note with an indicative scope

    Your gate

    You decide whether to proceed

  2. 02

    NDA & intake

    Drawings, BOM, revision status, test specs and packaging rules land with engineering.

    Deliverable

    Signed mutual NDA and a documentation receipt list

    Your gate

    You confirm the document set is complete

  3. 03

    Gap analysis

    What is documented, what lives only in the old supplier heads, what must be recreated.

    Deliverable

    Gap register with an owner and an action per item

    Your gate

    You approve the gap-closure plan

  4. 04

    Supplier mapping

    Directed-buy parts, alternates to qualify, long-lead items flagged early.

    Deliverable

    Component risk list: directed-buy, alternates, long-lead

    Your gate

    You approve directed-buy parts and alternates

  5. 05

    Industrialization

    Work instructions, fixtures and test procedures — the golden sample defined.

    Deliverable

    Work instructions, fixtures and the test procedure

    Your gate

    You approve the golden-sample definition

  6. 06

    Pilot batch

    Built on the real process, functionally tested, reviewed with you before ramp.

    Deliverable

    Pilot units with complete test records

    Your gate

    You review the pilot batch before ramp

  7. 07

    Validation

    First article and your written approval, against your standards.

    Deliverable

    First article inspection report against your standards

    Your gate

    Your written first-article approval

  8. 08

    Ramp & stock bridge

    Old and new supply overlap on purpose, so the shelf never runs dry.

    Deliverable

    Ramp plan with the agreed stock-bridge quantity

    Your gate

    You release the ramp

  9. 09

    Steady state

    Frame agreement, rolling forecast, lifecycle and obsolescence watch.

    Deliverable

    Frame agreement, forecast cadence and lifecycle watch

    Your gate

    You set the review rhythm

RISK MANAGEMENT

What keeps a transfer boring.

Stock bridge

The overlap quantity is planned with you before the first pilot unit is built.

Documentation truth

Undocumented field changes are back-documented into CAD and BOM, so the series starts from what actually works.

Component risk

Long-lead and end-of-life parts are flagged at intake, with alternates qualified against the datasheet.

No silent changes

Any deviation is proposed, approved and recorded — never absorbed quietly into the build.