Request for Quotation
Electrical documentation set used for supplier qualification

Qualify us the way you qualify anyone else.

This page exists so a sourcing manager can run a supplier qualification without three rounds of email. What we can hand over immediately is listed below; what needs a conversation is marked as such.

SUPPLIER ONBOARDING

From first contact to approved vendor.

01Introduction & fitScope, volumes and standardschecked against what weactually do.02NDAMutual NDA before technicaldata moves. Your template orours.03Company fileRegistration data,certificates and qualitydocumentation on request.04Technical reviewDrawings, BOM and testrequirements reviewed by theengineers who would run the05Audit or visitSupplier audits and planttours in Bursa are welcome, byappointment.06Quotation & termsNRE, tooling, test developmentand unit price quotedseparately — engineering is07Vendor setupFrame agreement, logisticsroute, forecast and reportingcadence agreed before the
  1. 01Introduction & fit

    Scope, volumes and standards checked against what we actually do.

  2. 02NDA

    Mutual NDA before technical data moves. Your template or ours.

  3. 03Company file

    Registration data, certificates and quality documentation on request.

  4. 04Technical review

    Drawings, BOM and test requirements reviewed by the engineers who would run the program.

  5. 05Audit or visit

    Supplier audits and plant tours in Bursa are welcome, by appointment.

  6. 06Quotation & terms

    NRE, tooling, test development and unit price quoted separately — engineering is never hidden in the piece price.

  7. 07Vendor setup

    Frame agreement, logistics route, forecast and reporting cadence agreed before the first release.

IP & CONFIDENTIALITY

Your product stays yours.

Get in touch
  • Product definition, drawings, firmware and brand remain your property — always.
  • NDA first: technical data moves only after mutual confidentiality is in place.
  • Program data is kept per customer; access is limited to the team running your program.
  • Tooling and fixtures are recorded with their owner named in the quotation.
  • Sub-suppliers work under flowed-down confidentiality obligations.
  • We never show your name, photos or drawings as a reference without written permission.
COMMERCIAL BASICS

How we quote and deliver.

Quotation structure

NRE, tooling, test equipment, setup, materials, conversion and logistics quoted as separate lines.

Frame agreements

Recurring families run on a frame agreement with rolling forecasts and agreed call-off windows.

Material liability

Long-lead and MOQ-driven material is agreed in writing before it is ordered.

Change control

Revision changes are quoted and released formally; nothing changes in the build without an approved revision.

HOW TO READ OUR CLAIMS

Three levels, stated plainly.

Sourcing teams get burned by suppliers who blur what is certified, what is engineering practice and what runs through a qualified partner. We keep the three apart on every page.

Certified

An accredited certificate covers the management system. We name the standard and share the certificate on request.

Built to standard

Design and routine testing follow the standard as engineering practice — it governs how we build and prove, without implying a separate product certificate for your unit.

Managed partner process

The process runs at a qualified supplier under GANI engineering, incoming inspection and one quality system. We say so rather than implying our own machine.

If a page ever claims more than this, treat it as an error and tell us — we will correct it.