32-axis under-bridge maintenance vehicle
Special maintenance platform that reaches the underside of a bridge deck through a multi-axis motion architecture and a modular suspended structure.
Division: GANI Engineering
TECHNICAL SCOPE
Technical scope
- 0132-axis motion architecture
- 02Access to the bridge underside
- 03Modular cage and platform structure
- 04Working area for the maintenance crew
Infrastructure & rail
CONTINUE
You might also be interested in.
Your inquiry goes to an engineer, not a call center.A qualified reply within two business days.


