Control panels for vulcanising presses
GANI MANUFACTURINGSERIES

Control panels for vulcanising presses

IEC 61439 panels for a British builder of rubber vulcanising presses — platen heating, hydraulic pressure and cure-cycle control, wired and tested zone by zone before they cross the Channel.

PROGRAM PROFILE
Delivery geography
United Kingdom
Annual volume
~180 panels/year
Batch size
10–15 per call-off
Variants in scope
5 press sizes
Program duration
Frame agreement, second year
Responsibility level
Series
Standards applied
IEC 61439-1/-2 · IEC 60204-1 · Customer test procedure
THE CHALLENGE

The press builder ships vulcanising presses to rubber and tyre plants across the UK and Europe. Every press carries platen heating zones, hydraulic pressure control and a cure recipe that has to hold its window for the whole cycle — a panel with long wiring runs, dozens of heater and thermocouple circuits and a test regime their electricians dreaded. Machine assembly was waiting on panels, and hiring more panel builders in the UK was not realistic.

STARTING CONDITION

A released electrical documentation set existed per press size, together with a customer test procedure covering heater continuity, insulation resistance and thermocouple polarity.

CUSTOMER PROVIDED
  • Electrical documentation and parts lists per press size
  • Approved component list with UK and EU supply preferences
  • Cure-cycle control specification and the customer PLC program
  • Test procedure with insulation and thermocouple acceptance criteria
  • Rolling twelve-month build forecast
GANI OWNED
  • Industrialization review of the panel documentation with agreed change notes
  • Panel build to IEC 61439 — heater, thermocouple, hydraulic and safety circuits
  • Thermocouple polarity and heater-circuit continuity checked zone by zone
  • Insulation resistance and functional test against the customer procedure
  • Test records archived per panel serial number
  • Packed and delivered to the UK assembly hall on an agreed weekly lane
OUTCOME

What the program delivers.

  • Recurring batches under a frame agreement with rolling call-offs
  • Golden sample approved after a joint first-article review in Bursa
  • A zone-by-zone test record travels with every panel
  • Customer electricians moved back onto press assembly and commissioning